
Claire Fitzmorris
•Used the DMAIC (Define, Measure, Analyze, Improve, and Control) cycle to improve management communication across Geismar site. -Reviewed... | New Orleans, New Orleans, United States
Claire Fitzmorris’s Emails cl****@ba****.com
Claire Fitzmorris’s Phone Numbers No phone number available.
Social Media
Claire Fitzmorris’s Location New Orleans, New Orleans, United States
Claire Fitzmorris’s Expertise •Used the DMAIC (Define, Measure, Analyze, Improve, and Control) cycle to improve management communication across Geismar site. -Reviewed tiered management boards across site to determine gaps in communication -Reported findings to Geismar site leadership to gain feedback and share best practices •Worked with a team to implement the use of tablets for maintenance and operations tasks in SAP -Collected feedback during pilot phase and helped determine requirements for improvement phase •Worked with engineers across various plants to determine the actual hydrogen usage across the site -Created a master drawing of hydrogen flow as a site development tool -Collected relevant drawings and meter specifications to close mass balance •Supported continuous improvement efforts to create visibility on site scaffolding use -Creating spreadsheet tracking tool using Visual Basic -Assisted in implementing scaffolding tracking process in units. •Participated in the BASF Professional Development Program (PDP) at two catalyst facilities •Managed various projects including bearing seal modifications, Sweco machine fitting improvements, and house cleaning vacuum troubleshooting and repair •Used SAP to create work orders, notifications, and purchase requisitions •Communicated scope of work to contractors to get quotes and manage installations •Assisted with capital projects •Worked with contractors to create total estimate for new dust collector instrumentation project proposal •Performed velocity testing and necessary calculations in dust collection lines to provide information for vendor to size equipment •Worked with vendor to plan truck scale installation •Assisted with reliability based maintenance including vibration analysis and ultrasonic testing.• Coordinated with vendors and mechanics on the overhaul of a cooling water pump as well as a refrigerant compressor •Served as liaison between maintenance outage team and New Orleans maintenance team for a multiservice compressor overhaul during an outage •Was responsible for air supply contingency plan for outages • Worked with corporate security to initiate a project for perimeter fence security control • Attended daily meetings in which the maintenance schedule and relevant safety issues were discussed • Attended maintenance budget meetings in which planned spending, unplanned spending, and routine maintenance were all forecasted by quarter • Assisted maintenance supervisor in communicating with maintenance workers, operations, contractors, and the project group for maintenance needs •Witnessed the safety-related procedures for the removal of asbestos-contaminated piping. Organized spare parts profiles on the fleet share site for three different product lines • Identified parts from a schematic, developed specifications for each part, and validated fit-for-service criteria • Worked with suppliers, OEMs, and internal parts management personnel to identify part numbers and sub-assemblies • Linked finalized profiles to technical documentation to provide easy, searchable access to teams • Configured and tested new flow meter calibration software • Developed a work instruction program for site mechanics • Consulted with mechanics on site to answer questions and confirm that software was properly configured. • Worked with mechanical engineering and piping design department on Ethylene Oxide Reactor and River Water Treatment projects • Used Piping and Instrumentation Diagrams to correct and compose equipment specifications and technical paper work including bid tabulations and line lists • Performed calculations by reviewing standards to find appropriate formulas and values • Attended biweekly project team meetings and gained a strong understanding of how consultants and their clients collaborate. •Provide troubleshooting assistance and technical support to maintenance crews on equipment failures •Improve equipment reliability and maintenance process by analyzing unplanned events •Evaluate repair options based on time, cost, and quality advantages -Reduce contaminants during pump repair by expanding passivation procedure to contain reverse circulation and upstream filtering mechanism to increase uptime by roughly 40 hours per month •Increased meantime between failures on an agitator seals by 48 months by lubrication upgrades •Oversee all offsite repairs for rotating equipment and work with vendors on upgrade opportunities •Reduced maintenance costs by $50,000/year by changing spare part design on an acid centrifuge •Participate in root cause failure analysis cases and work with reliability engineer on corrective actions.
Claire Fitzmorris’s Current Industry Syncom Space Services
Claire
Fitzmorris’s Prior Industry
ENGlobal
|
Air Products
|
BASF
|
Syncom Space Services
Not the Claire Fitzmorris you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

Syncom Space Services
Mechanical Design Engineer
Fri Jun 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
BASF
Mechanical Maintenance Engineer
Tue Nov 01 2016 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Jun 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time)
BASF
Site Development PDP
Tue Mar 01 2016 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Nov 01 2016 00:00:00 GMT+0000 (Coordinated Universal Time)
BASF
Maintenance Engineering PDP
Wed Jul 01 2015 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Mar 01 2016 00:00:00 GMT+0000 (Coordinated Universal Time)
Air Products
Maintenance Engineering Intern
Thu May 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Jul 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time)
Air Products
Fleet Operations Intern
Wed May 01 2013 00:00:00 GMT+0000 (Coordinated Universal Time) — Thu Aug 01 2013 00:00:00 GMT+0000 (Coordinated Universal Time)
ENGlobal
Engineering Intern
Tue May 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time) — Sun Jul 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time)