Responsibilities:
I’ve Worked Turnarounds and General Maintenance dealing with Hydro Blasting, Liquid Vacuum Trucks, Air- Movers, and Tank Cleaning.
I’ve conducted safety meetings with employees / Create Safety Topics on a daily basis.
I’ve provided assistance to line supervisors for risk management activities, including hazard identification and task risk assessments.
I’ve identified safety hazards and taken the necessary actions to minimize or alleviate incidents, wrote Hot Work Permits.
I’ve conducted incident investigations and complete reports as needed.
I’ve conducted daily walkthroughs and inspections on the worksite and other designated locations as needed.
I’ve maintained the HSE central action tracking register at the worksite and followed up with supervisors on closing action items.
I’ve maintained H2S monitors, Four Gas Monitors as far as Bump testing daily, Calibration monthly, and keeping a log of all hits that were on the monitors.
I’ve conducted Several Safety Audits Weekly, and discussed at monthly KPI Meetings.
I’ve maintained Employees Training, and Drug Test.
I’ve maintained the LPS System, LPO’s, NL’s, Losses, and Preformed LPSA’s Daily.
Responsibilities:
I’ve Worked Turnaround, Decommissioning of Decks with Mercury, and NORM, Construction along with E&I, Safety Audits.
I’ve conducted safety meetings with employees / Create Safety Topics on a daily basis.
I’ve provided assistance to line supervisors for risk management activities, including hazard identification and task risk assessments.
I’ve identified safety hazards and taken the necessary actions to minimize or alleviate incidents, wrote Hot Work Permits.
I’ve conducted incident investigations and complete reports as needed.
I’ve conducted daily walkthroughs and inspections on the worksite and other designated locations as needed.
I’ve maintained the HSE central action tracking register at the worksite and followed up with supervisors on closing action items.
I’ve tracked Near Miss and created trend analysis.
I’ve conducted Basic Orientation.
• I’ve built and maintained a strong customer relationship with customers, contractors and vendors.
• I’ve managed the supervision of the welding and fitting trades.
• I’ve worked with the planning of projects to minimize delays, maximize efficiency and ensure a smoothly run project.
• I supervised the construction of 300’ supply vessels for Gulf Mark and Oceaneering at BAE Shipyard in Mobile, AL
• I completed bids on barge and vessel repair jobs.
• I’ve coordinated with ABS Class, Coast Guard and customer inspectors for successful inspections of completed work.
• I’ve provided assistance to line supervisors for risk management activities, including hazard identification and task risk assessments.
• Built and maintained a strong customer relationship with customers, contractors, and vendors.
• Managed the supervision at the 3 ship yard facilities (Stephensville, Berwick, and Baldwin) with a workforce of over 250 employees.
• Completed bids for multi-million dollar barge repairs as well as new construction bids.
• I’ve been involved in the process of obtaining multi-million dollar barge contracts.
• I’ve planned and coordinated the purchasing of materials needed to complete each project.
• I’ve scheduled man hours to make productivity more cost efficient, saving the company money.
• I’ve established and maintained ship repair budgets.
• I’ve read and understood blue prints and specifications for all projects.
• Met with ABS Class Surveyors and Coast Guard to establish inspection plans on projects, prepared for, and carried out inspections with Class.
• I’ve planned and conducted the launching of barges and vessels in conjunction with a heavy lift contractor.
• I’ve managed the installation of a barge side launch system, built from the ground up.
• I’ve managed multiple tandem crane lifts.
• I’ve oversaw the erection of dry dock sections and then supervised the installation of this dry dock.
• I’ve supervised the demolition of an old Navy dry dock system.
• I coordinated the opening of a new dry dock and top side repair facility bringing in new costumers and more revenue.
• I’ve established two new construction facilities with CNC table and brake press; increasing productivity and lowering costs.
• Planned projects to minimize delays, maximize efficiency and ensure a
smoothly run project.
• Participated in OSHA safety audits with workers comp representatives.
• I’ve ensured that all of the HSE performance of all disciplines and subcontractors is in accordance with contractual HSE commitments.
• I’ve conducted periodic walkthroughs and inspections at worksites and other designated locations to make sure production deadlines are being met.
Worked my way up from Roller/Press Brake operator through Fitting Supervisor to Safety Technician.
-Conducted Safety Inspections and accident investigations.
-Conduct safety meetings, and maintain safety records.
-Submitted weekly safety reports to management.
-Supervised over 20 fitter, trained in blue print reading, during my tenure as fitting supervisor.
-Obtained Competent person certification.