Rob Pascarella, Pe

Rob Pascarella, Pe

First-line rotating equipment [turbines/generators/exciters/critical pumps/auxiliaries] technical support for fleet plants, working with many OEMs/other major Entergy vendors: -First ... | Houston, Texas, United States

Rob Pascarella, Pe Email Addresses

rp****@en****.com Work Email
rp****@en****.com Personal Email
ro****@si****.com Personal Email

Rob Pascarella, Pe Phone Numbers

No phone number available

Rob Pascarella, Pe Work History
Entergy
Turbine-Generator SME and Siemens Alliance Manager
1 February 2016 — Present
Siemens
Project Manager and Turbine Engineer
1 June 2008 — 1 February 2016
Allegheny Energy
Engineering Intern
1 May 2007 — 1 August 2007
Rob Pascarella, Pe Current Work Details
Rob Pascarella, Pe's Location
Houston, Texas, United States
Rob Pascarella, Pe's Expertise
  • First-line rotating equipment [turbines/generators/exciters/critical pumps/auxiliaries] technical support for fleet plants, working with many OEMs/other major Entergy vendors: -First contact for fossil sites experiencing rotating equipment issues; often working with Entergy contractors on solutions. -Self-performed 4 forced outage evolutions utilizing internal mechanics, saving direct costs. -Aid in scope, planning, & advisement of $100K-$40M major outage evolutions and upgrades. -Strategize long term and execute day-to-day Siemens Alliance agreement, focusing on achieving performance expectations and opportunities saving on parts and staffing of contracted outages, $10M guaranteed expenditure over contract life. -Advisory input of 5-year plan: O&M/Capital rotating equipment expenditures. -Brainstormed, developed, and continually manage an Engineering Skills Development Program that architects proper training and mentoring opportunities for new Entergy engineers. -Bolstered expertise in analysis and purchase of $315M 3x1 CCGT facility as part of the Choctaw Due Diligence Team. -Assist five $190M-$950M new plant construction sites (3-2x1 CCGT sites, 1 simple-cycle site, and 1 reciprocating engine site)via consultative technical troubleshooting, witness point support, and turbine lead team support. -Partnering with Entergy IT, PM&D center, and vendors to establish CIP-compliant predictive maintenance test program. -Presented on foundation/vibration issues as guest speaker at EPRI Turbine Generator User’s Group conference. -Provide communication and due diligence as EPRI P65 Advisor to Entergy on projects as a part of a $300K/year relationship. -Helped in creating knowledge transfer value and opportunities for all employees to engage with upper management; fostering a two-way street for company growth, and boosted engagement as Generational ERG Vice-Chair 2017-18. Grew the group from 200 to 500+ active members in 2 years, provided 11 valuable opportunities.Trained in the theories, operation, and maintenance of steam and gas turbine/generator systems, and their valves and auxiliaries; gained massive experience and fluency in Westinghouse, Siemens, and Allis Chalmers [OEM] lingos: -Served customers as Project Manager and/or Floor Engineer during 43 outages/projects; leading and supervising both union and non-union teams. Outages ranged from simple $20K forced outage troubleshooting events to $40M turnkey turbine upgrades. -Guided utilities with major evolutions: outage work scope and budget, inspection recommendations, risk assessments of equipment life and condition; Planned for contingency measures and emergent work situations. -Directed total disassembly/cleaning/inspection and provided recommendations on all assemblies of turbine/generator equipment quoted, while coordinating with Siemens design engineering and vendors on the troubleshooting of findings. -Led all proper reassembly procedures and calculations (clearances, internal/rotor alignment, etc.) for quality run condition. -Prepared schedules, rigging plans, laydown plans, parts lists, mob/demobilization coordination activities, safety procedures, and coordinated shop activities/logistics, etc. for highly detailed planning of project framework, providing smooth outage execution. -Proved technical writing experience via supplying a comprehensive report detailing all scope performed, inspection findings, repairs completed, and associated data for each completed project. -Assisted customers including First Energy, Exelon, Georgia Power, OUC, KCP&L, Entergy, PPG (AXIALL), NRG, ConocoPhillips (unit operated by Entergy), GenPower (Longview Power, LLC). -Established strong communication, interpersonal, and supervisory skills across all functional/generational/educational levels. -Assisted in the continuously safety driven “zero-harm” culture by striving for no injuries during outage evolutions.Trained under plant engineers in areas of super-critical boiler operation and maintenance, welding procedures, planning, and safety procedures. Designed and implemented a tooling storage and retrieval system for the Siemens HMN special turbine tooling.
Rob Pascarella, Pe's Current Industry
Entergy
Rob Pascarella, Pe's Prior Industry
Allegheny Energy | Siemens | Entergy

Rob Pascarella, Pe Education

College Logo
Camden County College
Camden County College Associate's degree, Business Administration and Management, General

Not the Rob Pascarella, Pe you were looking for?

Find accurate emails & phone numbers for over 700M professionals.

Search

FAQ About Rob Pascarella, Pe

  • Rob Pascarella, Pe is located at Houston, Texas, United States

  • Rob Pascarella, Pe is a First-line rotating equipment [turbines/generators/exciters/critical pumps/auxiliaries] technical support for fleet plants, working with many OEMs/other major Entergy vendors: -First contact for fossil sites experiencing rotating equipment issues; often working with Entergy contractors on solutions. -Self-performed 4 forced outage evolutions utilizing internal mechanics, saving direct costs. -Aid in scope, planning, & advisement of $100K-$40M major outage evolutions and upgrades. -Strategize long term and execute day-to-day Siemens Alliance agreement, focusing on achieving performance expectations and opportunities saving on parts and staffing of contracted outages, $10M guaranteed expenditure over contract life. -Advisory input of 5-year plan: O&M/Capital rotating equipment expenditures. -Brainstormed, developed, and continually manage an Engineering Skills Development Program that architects proper training and mentoring opportunities for new Entergy engineers. -Bolstered expertise in analysis and purchase of $315M 3x1 CCGT facility as part of the Choctaw Due Diligence Team. -Assist five $190M-$950M new plant construction sites (3-2x1 CCGT sites, 1 simple-cycle site, and 1 reciprocating engine site)via consultative technical troubleshooting, witness point support, and turbine lead team support. -Partnering with Entergy IT, PM&D center, and vendors to establish CIP-compliant predictive maintenance test program. -Presented on foundation/vibration issues as guest speaker at EPRI Turbine Generator User’s Group conference. -Provide communication and due diligence as EPRI P65 Advisor to Entergy on projects as a part of a $300K/year relationship. -Helped in creating knowledge transfer value and opportunities for all employees to engage with upper management; fostering a two-way street for company growth, and boosted engagement as Generational ERG Vice-Chair 2017-18. Grew the group from 200 to 500+ active members in 2 years, provided 11 valuable opportunities.Trained in the theories, operation, and maintenance of steam and gas turbine/generator systems, and their valves and auxiliaries; gained massive experience and fluency in Westinghouse, Siemens, and Allis Chalmers [OEM] lingos: -Served customers as Project Manager and/or Floor Engineer during 43 outages/projects; leading and supervising both union and non-union teams. Outages ranged from simple $20K forced outage troubleshooting events to $40M turnkey turbine upgrades. -Guided utilities with major evolutions: outage work scope and budget, inspection recommendations, risk assessments of equipment life and condition; Planned for contingency measures and emergent work situations. -Directed total disassembly/cleaning/inspection and provided recommendations on all assemblies of turbine/generator equipment quoted, while coordinating with Siemens design engineering and vendors on the troubleshooting of findings. -Led all proper reassembly procedures and calculations (clearances, internal/rotor alignment, etc.) for quality run condition. -Prepared schedules, rigging plans, laydown plans, parts lists, mob/demobilization coordination activities, safety procedures, and coordinated shop activities/logistics, etc. for highly detailed planning of project framework, providing smooth outage execution. -Proved technical writing experience via supplying a comprehensive report detailing all scope performed, inspection findings, repairs completed, and associated data for each completed project. -Assisted customers including First Energy, Exelon, Georgia Power, OUC, KCP&L, Entergy, PPG (AXIALL), NRG, ConocoPhillips (unit operated by Entergy), GenPower (Longview Power, LLC). -Established strong communication, interpersonal, and supervisory skills across all functional/generational/educational levels. -Assisted in the continuously safety driven “zero-harm” culture by striving for no injuries during outage evolutions.Trained under plant engineers in areas of super-critical boiler operation and maintenance, welding procedures, planning, and safety procedures. Designed and implemented a tooling storage and retrieval system for the Siemens HMN special turbine tooling. Entergy

  • Rob Pascarella, Pe currently works in the Entergy

  • Rob Pascarella, Pe specializes in First-line rotating equipment [turbines/generators/exciters/critical pumps/auxiliaries] technical support for fleet plants, working with many OEMs/other major Entergy vendors: -First contact for fossil sites experiencing rotating equipment issues; often working with Entergy contractors on solutions. -Self-performed 4 forced outage evolutions utilizing internal mechanics, saving direct costs. -Aid in scope, planning, & advisement of $100K-$40M major outage evolutions and upgrades. -Strategize long term and execute day-to-day Siemens Alliance agreement, focusing on achieving performance expectations and opportunities saving on parts and staffing of contracted outages, $10M guaranteed expenditure over contract life. -Advisory input of 5-year plan: O&M/Capital rotating equipment expenditures. -Brainstormed, developed, and continually manage an Engineering Skills Development Program that architects proper training and mentoring opportunities for new Entergy engineers. -Bolstered expertise in analysis and purchase of $315M 3x1 CCGT facility as part of the Choctaw Due Diligence Team. -Assist five $190M-$950M new plant construction sites (3-2x1 CCGT sites, 1 simple-cycle site, and 1 reciprocating engine site)via consultative technical troubleshooting, witness point support, and turbine lead team support. -Partnering with Entergy IT, PM&D center, and vendors to establish CIP-compliant predictive maintenance test program. -Presented on foundation/vibration issues as guest speaker at EPRI Turbine Generator User’s Group conference. -Provide communication and due diligence as EPRI P65 Advisor to Entergy on projects as a part of a $300K/year relationship. -Helped in creating knowledge transfer value and opportunities for all employees to engage with upper management; fostering a two-way street for company growth, and boosted engagement as Generational ERG Vice-Chair 2017-18. Grew the group from 200 to 500+ active members in 2 years, provided 11 valuable opportunities.Trained in the theories, operation, and maintenance of steam and gas turbine/generator systems, and their valves and auxiliaries; gained massive experience and fluency in Westinghouse, Siemens, and Allis Chalmers [OEM] lingos: -Served customers as Project Manager and/or Floor Engineer during 43 outages/projects; leading and supervising both union and non-union teams. Outages ranged from simple $20K forced outage troubleshooting events to $40M turnkey turbine upgrades. -Guided utilities with major evolutions: outage work scope and budget, inspection recommendations, risk assessments of equipment life and condition; Planned for contingency measures and emergent work situations. -Directed total disassembly/cleaning/inspection and provided recommendations on all assemblies of turbine/generator equipment quoted, while coordinating with Siemens design engineering and vendors on the troubleshooting of findings. -Led all proper reassembly procedures and calculations (clearances, internal/rotor alignment, etc.) for quality run condition. -Prepared schedules, rigging plans, laydown plans, parts lists, mob/demobilization coordination activities, safety procedures, and coordinated shop activities/logistics, etc. for highly detailed planning of project framework, providing smooth outage execution. -Proved technical writing experience via supplying a comprehensive report detailing all scope performed, inspection findings, repairs completed, and associated data for each completed project. -Assisted customers including First Energy, Exelon, Georgia Power, OUC, KCP&L, Entergy, PPG (AXIALL), NRG, ConocoPhillips (unit operated by Entergy), GenPower (Longview Power, LLC). -Established strong communication, interpersonal, and supervisory skills across all functional/generational/educational levels. -Assisted in the continuously safety driven “zero-harm” culture by striving for no injuries during outage evolutions.Trained under plant engineers in areas of super-critical boiler operation and maintenance, welding procedures, planning, and safety procedures. Designed and implemented a tooling storage and retrieval system for the Siemens HMN special turbine tooling.

  • Rob Pascarella, Pe speaks the following languages: No languages available.

  • Rob Pascarella, Pe has prior experience in the following industries: Siemens , Allegheny Energy

  • Rob Pascarella, Pe has the following professional experience: Entergy , Siemens , Allegheny Energy .

  • You can view Rob Pascarella, Pe’s LinkedIn profile at LinkedIn URL.

  • Rob Pascarella, Pe’s work email addresses are [email protected] .

  • Rob Pascarella, Pe works at Entergy