
Aboobacker Siddique
March 2007 – Present (5 years 2 months) Up gradation of SCADA systems for Well head Towers- Fully involved... | United Arab Emirates
*50 free lookup(s) per month.
No credit card required.
Aboobacker Siddique’s Emails ab****@gs****.com
Aboobacker Siddique’s Phone Numbers No phone number available.
Social Media
Aboobacker Siddique’s Location United Arab Emirates
Aboobacker Siddique’s Expertise March 2007 – Present (5 years 2 months) Up gradation of SCADA systems for Well head Towers- Fully involved during FEED, Detailed Engg, FAT and SAT and full involvement with design of SCADA to DCS interface through OPC Technology MOOCS (modification of offshore control systems) project - Full Involvement, right from detailed engineering ,Installation and commissioning of ABB infi 90 DCS at the ADMA-OPCO off shore platform interlinking various platforms such as, Separators,, Gas treatment plants, water Injection plants. Full involvement with EPC contractor for the up gradation of infi 90 to ABB 800XA display system Focal point with EPC contractor for RTU Installation and commissioning at Well head Towers (oil wells and Gas wells), Development of SAT and FAT procedures, Acceptance criteria Full involvement throughout engineering, Installation and commissioning of GE Fanuc 90/70 PLC based F&G and ESD systems for Gas treatment platforms comprising Inlet separators, slug catchers and Gas dehydration trains -for 2 platforms, namely GTP and NGTP Full involvement throughout engineering ,Installation and commissioning and configuration of GE Fanuc 90/70 PLC based F&G system and ICS Trusted TMR ESD system for TA Platform of ADMA-OPCO consisting of 3 Gas Dehydration Trains Engineered and commissioned dual redundant fire Pumps control system with Allen Bradley PLC (SLC 500) based system for the plant wide Fire water network Managed the installation and commissioning of Automatic Flare Igniton control system with Siemens S7 PLC based system Master display network for F&G Systems- Plant wide network connecting Plant area PLCs including accommodation platforms for Central monitoring at Main control room ,on redundant Ethernet LAN - Full involvement in Project management, detailed Engineering ,FAT and SAT Fully responsible for the hot changeover to new systems, Planned/Managed all the above projects successfully for the hot changeover
Aboobacker Siddique’s Current Industry Adma Opco
Aboobacker
Siddique’s Prior Industry
G Systems
|
Drives
|
Century Peripherals
|
1
|
Adma Opco
Not the Aboobacker Siddique you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

Adma Opco
Systems Engineer-Control
Thu Mar 01 2007 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
G Systems
Control Electronics Specialist
Mon Nov 01 1999 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
1
Electronics Engineer
Sun Sep 01 1991 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Nov 01 1999 00:00:00 GMT+0000 (Coordinated Universal Time)
Century Peripherals
Production Engineer
Sat Aug 01 1987 00:00:00 GMT+0000 (Coordinated Universal Time) — Sat Jun 01 1991 00:00:00 GMT+0000 (Coordinated Universal Time)
Drives
Development Engineer
Thu Jan 01 1987 00:00:00 GMT+0000 (Coordinated Universal Time) — Sat Aug 01 1987 00:00:00 GMT+0000 (Coordinated Universal Time)
G Systems
Control Electronics Specialist
— Present