
Anil Pandey
TOTAL EXPERIENCE : 20 years. OPERATIONS & COMMISSIONING ... | Dhanbad, Jharkhand, India
*50 free lookup(s) per month.
No credit card required.
Anil Pandey’s Emails an****@ta****.com
Anil Pandey’s Phone Numbers No phone number available.
Social Media
Anil Pandey’s Location Dhanbad, Jharkhand, India
Anil Pandey’s Expertise TOTAL EXPERIENCE : 20 years. OPERATIONS & COMMISSIONING COLD START UP, HOT START UP, WARM START UP, NORMAL OPERATION, EMERGENCY HANDLING AND SAFE SHUT DOWN OF UNITS. LINE UP OF THE UNIT AND ITS AUXILIARIES, CHANGEOVER OF EQUIPMENTS, ROUTINE TESTING OF PROTECTION SYSTEM AND ANNUNCIATION SYSTEM. HANDLING CONTINGENCY CONDITIONS OF PLANT/ELECTRICAL NETWORK SUCH AS ISLANDED CONDITION FROM GRID, VOLTAGE AND FREQUENCY JERK, STATION BLACK OUT. OVERSEEING SEVERAL TYPES OF EMERGENCIES IN POWER PLANT VIZ., SYSTEM TROUBLE, LOAD THROW OFF, STATION BLACK OUT, TURBINE & ELECTRICAL SITE AND BALANCING GENERATION AS PER BOILER EMERGENCIES. IDENTIFYING AREAS OF BREAKDOWNS AND TAKING STEPS TO RECTIFY THE EQUIPMENT THROUGH APPLICATION OF TROUBLESHOOTING TOOLS LIKE ROOT CAUSE ANALYSIS. CARRYING OUT PRE AND POST TRIPPING ANALYSIS OF CONTINGENCY CONDITIONS, GENERATION OF REPORTS AND LOGS FOR GENERATION AND LOAD. USING ERP SYSTEM (ENTREPRENEURS RESOURCES PLANNING) THROUGH ON LINE SYSTEMS LIKE MAXIMO, SAP ETC IN TROUBLE-LOGGING AND RECORD MAKING. COMMISSIONING COMMISSIONING OF THE COAL BASED THERMAL POWER PLANT EQUIPMENT (STEAM TURBINE&BOILER) AS WELL AS CONDUCTING TESTS & INSPECTIONS TO ENSURE OPERATIONAL EFFECTIVENESS OF PLANT & UTILITIES. INVOLVED IN INSTALLATION, VIBRATION PERFORMANCE TRIALS, SYSTEM LAYOUTS AND CHECKS OF MAIN AND AUXILIARY MACHINERY AND PREPARING DOCUMENTS FOR THE SAME. PROCESS ENHANCEMENTS IDENTIFYING SCOPE FOR: MODIFICATIONS IN EQUIPMENT, PROCESS FLOW, WORKING PRACTICES, CONSUMABLES, POWER, ETC. FOR CONTROLLING & REDUCING CONVERSION COST PER UNIT PRODUCED. IMPLEMENTING VARIOUS TECHNIQUES FOR CYCLE TIME REDUCTION, ENTAILING IDENTIFICATION OF Specialties: CORE COMPETENCIES: OPERATIONS, COMMISSIONING AND PROCESS ENHANCEMENTS OF COAL BASED THERMAL POWER PLANT.
Anil Pandey’s Current Industry Tpsodl
Anil
Pandey’s Prior Industry
Tata Power
|
Aditya Birla Group Hindalco
|
Adani Power Limited Mundra Kutch Gujrat
|
Wardha Power Company Limited Warora Chandrapur Maharashtra
|
Lanco Anapara 2x600mw
|
Mpl A Joint Venture Oftata Power And Dvc
|
Tpsodl
Not the Anil Pandey you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

Tpsodl
Store Manager
Fri Jan 01 2021 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
Tata Power
Shift Incharge
Thu Oct 01 2015 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
Mpl A Joint Venture Oftata Power And Dvc
Mpl
Sun Jan 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
Lanco Anapara 2x600mw
Shift Incharge 2x600mw Operation
Wed Jun 01 2011 00:00:00 GMT+0000 (Coordinated Universal Time) — Sun Jan 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time)
Wardha Power Company Limited Warora Chandrapur Maharashtra
Dy Manager
Mon Jun 01 2009 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Jun 01 2011 00:00:00 GMT+0000 (Coordinated Universal Time)
Adani Power Limited Mundra Kutch Gujrat
Dy Manager
Sat Mar 01 2008 00:00:00 GMT+0000 (Coordinated Universal Time) — Sat Aug 01 2009 00:00:00 GMT+0000 (Coordinated Universal Time)
Aditya Birla Group Hindalco
Desk Engineer
Sun Dec 01 1996 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Feb 01 2008 00:00:00 GMT+0000 (Coordinated Universal Time)
Tata Power
Shift Incharge
— Present