
Biswarup Mukherjee
CAREER SUMMARY 1. Project & Construction Management of Electrical Infrastructure for Plants, Facilities and Substations - Feasibility & Scope Studies, ... | Kennewick, Washington, United States
*50 free lookup(s) per month.
No credit card required.
Biswarup Mukherjee’s Emails bi****@nu****.com
Biswarup Mukherjee’s Phone Numbers No phone number available.
Social Media
Biswarup Mukherjee’s Location Kennewick, Washington, United States
Biswarup Mukherjee’s Expertise CAREER SUMMARY 1. Project & Construction Management of Electrical Infrastructure for Plants, Facilities and Substations - Feasibility & Scope Studies, Conceptual Engineering, Project Charter with Estimation and Construction Supervision for Large Industrial Plants & Utility Substations / Power Distribution Systems 2. Project Electrical Lead / Responsible Engineer with Procurement & Construction Support - Engineering of Power Systems for Utility & Infrastructure – Power Distribution with Substations and Oil & Gas Including Gas Pipelines PROFESSIONAL SKILLS • Scope Assessment with Estimation for Material & Man-Hour, Conceptual Engineering and Project Charter preparation • Cost optimization for multiple proposals with preparation of AFE • Procurement including: (i) MRQ with specifications & datasheets (ii) bid evaluation / MRP of equipment and (iii) selection of equipment / modular buildings • Vendor / Contractor Management with: (i) Selection of vendors & contractors; (ii) interaction with vendors for FAT & delivery of equipment; (iii) review of contractors’ submittals / shop drawings • Supervision with technical guidance to contractors, engineers & technologists for job completion, quality & safety • Management of commissioning with approving switching programs • Review of system installation checklists & construction commissioning plan • Commissioning observations and conducting construction commissioning progress meetings • Preparation of pre-commissioning test notifications for appropriate authorities • Review of inspection & test reports for equipment & installations • Review & approval of contractors’ invoices • Project close-out including inventory reconciliation and project documentation • Delivery of IFC / CW Packages Including : (i) ETAP / SKM; (ii) Electrical Calculations, (iii) SLDs, Schematics, Area Classification, Layouts, Schedules, E & C Modular Buildings, EHT Designs • Standards & Codes compliances: IEEE, ANSI, NETA, IEC, NEMA, API, NFPA / NEC & CEC
Biswarup Mukherjee’s Current Industry Nutrien
Biswarup
Mukherjee’s Prior Industry
Bharat Heavy Electricals
|
Cesc
|
Ei Mark Engineering
|
Snc Lavalin
|
Tri Ocean Engineering
|
Rotaflow Controls
|
Thermon Manufacturing
|
Vista Projects
|
Fluor
|
Globecon
|
The Goodyear Tire And Rubber
|
S And A
|
Power Systems Asset Management Solutions
|
Nutrien
Not the Biswarup Mukherjee you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

Nutrien
Electrical Project Manager (Independent Consultant)
Mon Apr 01 2019 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
Power Systems Asset Management Solutions
Senior Project Engineer
Thu Feb 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Apr 01 2019 00:00:00 GMT+0000 (Coordinated Universal Time)
S And A
Senior Electrical Engineer
Sun Oct 01 2017 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Jan 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time)
The Goodyear Tire And Rubber
Senior Electrical Engineer (Independent Consultant )
Tue Nov 01 2016 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Sep 01 2017 00:00:00 GMT+0000 (Coordinated Universal Time)
Globecon
Electrical Engineering Professional (Independent Consultant )
Sat Nov 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Nov 01 2016 00:00:00 GMT+0000 (Coordinated Universal Time)
Fluor
Electrical Design Engineer - IV (Independent Consultant )
Sun Dec 01 2013 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Oct 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time)
Vista Projects
Electrical Engineering Professional (Independent Consultant )
Tue Mar 01 2011 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Nov 01 2013 00:00:00 GMT+0000 (Coordinated Universal Time)
Thermon Manufacturing
Electrical Engineering Professional (Independent Consultant)
Mon Mar 01 2010 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Mar 01 2011 00:00:00 GMT+0000 (Coordinated Universal Time)
Rotaflow Controls
Electrical Specialist
Sat Aug 01 2009 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Jan 01 2010 00:00:00 GMT+0000 (Coordinated Universal Time)
Tri Ocean Engineering
Electrical Specialist
Wed Nov 01 2006 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Dec 01 2008 00:00:00 GMT+0000 (Coordinated Universal Time)
Snc Lavalin
Electrical Specialist
Thu Sep 01 2005 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Aug 01 2006 00:00:00 GMT+0000 (Coordinated Universal Time)
Ei Mark Engineering
Engineering Services Professional (Independent Consultant )
Fri Jul 01 2005 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Aug 01 2005 00:00:00 GMT+0000 (Coordinated Universal Time)
Cesc
Assistance Manager, Distribution
Mon Aug 01 1988 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Sep 01 2004 00:00:00 GMT+0000 (Coordinated Universal Time)
Bharat Heavy Electricals
Engineer
Wed Oct 01 1986 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Feb 01 1988 00:00:00 GMT+0000 (Coordinated Universal Time)