
Prakash Velmayil
Project : Additional Development Project VASAI East Field. (Produced Water Conditioning Skid Package) Client : L&T VALDEL ENGINEERING... | United Arab Emirates
*50 free lookup(s) per month.
No credit card required.
Prakash Velmayil’s Emails fa****@ya****.co
Prakash Velmayil’s Phone Numbers No phone number available.
Social Media
Prakash Velmayil’s Location United Arab Emirates
Prakash Velmayil’s Expertise Project : Additional Development Project VASAI East Field. (Produced Water Conditioning Skid Package) Client : L&T VALDEL ENGINEERING LTD. Responsibilities: Piping and General Arrangement Preparation. Knowledge in process Equipment, Compression and P & ID symbols and methods. Preparation of Isometric Drawing with Bill of materials. Checking Isometrics as per GA & P&ID. Preparation of Support Location Drawing with detail support Fabrication Arrangements. Preparation of Piping MTO. Drawing review and preparing Checklist. Site visit for drawing Finalization. As Built drawing Preparation. Coordinate with Production Department to support Manufacturing. Project : Increased Water Handling Facilities. Client : BONATTI. Responsibilites: Piping and General Arrangement Preparation. Knowledge in process Equipment, Compression and P & ID symbols and methods. Preparation of Isometric Drawing with Bill of materials. Checking Isometrics as per GA & P&ID. Preparation of Support Location Drawing with detail support Fabrication Arrangements. Preparation of Piping MTO. Drawing review and preparing Checklist. Site visit for drawing Finalization. As Built drawing Preparation. Coordinate with Production Department to support Manufacturing.Specialist Services is a global supplier of Process equipment packages for the oil & Gas Industry. Services and equipment ranges from Well Testing packages, Process and Skid Mounted equipment Packages. Key Customers include Weatherford, Schlumberger, Halliburton, Expro & Petrofac. Responsibilities: Develop and review Equipment Drawings, Piping drawings based on technical and client requirements. Preparation of Mechanical Data Sheet, TDC for Vessel Materials and Valve Data sheet. Preparing MTO for Packages (Pressure Vessel & Piping) Coordinate with Clients & other Engineering disciplines. Extend Support to shop personnel during fabrication. Adherence to relevant codes and standards. Key projects Handled: Trailer Mounted Well testing package with 2160 Psig Separator, Client – Weatherford EPF Facilities in majnoon oil field, Southern Iraq, Client – Petrofac. Project : BTTP, 2 x 660MW Coal Fired Supercritical Power Plant. Responsibilities: Piping and General Arrangement Preparation. Preparation of Intelligent P&ID. Knowledge in process Equipment, Compression and P & ID symbols and methods. Preparation of Isometric Drawing with Bill of materials. Checking Isometrics as per GA & P&ID. Preparation of Support Location Drawing with detail support Fabrication Arrangements. Preparation of Piping MTO. Drawing review and preparing Checklist. Site visit for drawing Finalization. As Built drawing Preparation. Coordinate with Production Department to support Manufacturing.Client : PETRO CONSTRUCTORS LLC, HOUSTON, U.S.A Responsibilities: Piping and General Arrangement Preparation. Knowledge in process Equipment, Compression and P & ID symbols and methods. Preparation of Isometric Drawing with Bill of materials. Checking Isometrics as per GA & P&ID. Preparation of Support Location Drawing with detail support Fabrication Arrangements. Preparation of Piping MTO. Drawing review and preparing Checklist. Site visit for drawing Finalization. As Built drawing Preparation. Coordinate with Production Department to support Manufacturing.Client: Kuwait Oil Company, Kuwait Project: Revamping of GatheringCenters and ManifoldCenters. Summary: Revamp of GatheringCenters & Re-Routing of Existing Pipelines and Launchers.The existing Plant comprised of 5 Sub-Centers which was then Revamped to 9 Sub-Centers. Providing design for piping layout, piping plans, isometric drawings, and as-built drawings preparation Using Cadworx Design Software. Responsibilities: Piping and General Arrangement Preparation. Pdownloadreparation of Intelligent P&ID. Knowledge in process Equipment, Compression and P & ID symbols and methods. Preparation of Isometric Drawing with Bill of materials. Preparation of Support Location Drawing with detail support Fabrication Arrangements. Checking Isometrics as per GA & P&ID. Pration of Piping MTO. Drawing review and preparing Checklist. Site visit for drawing Finalization. As Built drawing Preparation. Coordinate with Production Department to support Manufacturing. Client: Bader Al Mullah – Kuwait /JO Project: HP Gas and Drain System Summary: Re-Routing of Existing Pipelines and connnecting to the storage areas. Providing design for piping layout, piping plans, isometric drawings, and as-built drawings preparation Using Cadworx Design System. Responsibilities: Piping and General Arrangement Preparation. Pdownloadreparation of Intelligent P&ID. Knowledge in process Equipment, Compression and P & ID symbols and methods. Preparation of Isometric Drawing with Bill of materials. Checking Isometrics as per GA & P&ID. Preparation of Support Location Drawing with detail support Fabrication Arrangements. Preparation of Piping MTO. Drawing review and preparing Checklist. Site visit for drawing Finalization. As Built drawing Preparation. Coordinate with Production Department to support Manufacturing.Project: 34 TPD PIB Plant Expansion Project Summary: The running plant has 17 TPD capacity of Poly Iso Butylenes production and now we are doing the new 34 TPD plant. Providing design lead for preparation piping specification, valve data sheets, equipment layout, piping layout, piping plan, isometric, vessel design and as-built drawings preparation. Responsibility: 1 Design co-ordination (piping layout, piping plan, as-built drawings preparation) 2 Equipment & Piping Modeling 3 ISO Generation 4 Interference Checking. Job Profile : Design, drafting and detailing of various equipments for the manufacture Cell phone towers and pipes.Design, drafting and detailing of various equipments for the manufacture Cell phone towers and pipes.Job Profile : Inspecting Incoming components, preparation of X&R BAR chart.
Prakash Velmayil’s Current Industry Peerless Europe Limited
Prakash
Velmayil’s Prior Industry
IN UCAL FUEL SYSTEMS LTD
|
IN GANGES INTERNATIONAL PVT.LTD
|
Ganges International Pvt.Ltd
|
IN SPIC-SMO
|
GULF SPIC GENERAL TRADING & CONTRACTING COMPANY WLL
|
PETRO CONSTRUCTORS
|
PARSONS BRINCKERHOFF
|
Specialist Services Group
|
Peerless Europe Limited
Not the Prakash Velmayil you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

Peerless Europe Limited
Piping Designer
Mon Dec 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time) — Sat Oct 01 2016 00:00:00 GMT+0000 (Coordinated Universal Time)
Specialist Services Group
piping designer
Wed Aug 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Dec 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time)
PARSONS BRINCKERHOFF
Piping Designer
Tue Mar 01 2011 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Aug 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time)
PETRO CONSTRUCTORS
piping designer
Mon Sep 01 2008 00:00:00 GMT+0000 (Coordinated Universal Time) — Sat Jan 01 2011 00:00:00 GMT+0000 (Coordinated Universal Time)
GULF SPIC GENERAL TRADING & CONTRACTING COMPANY WLL
Piping Designer
Mon Jan 01 2007 00:00:00 GMT+0000 (Coordinated Universal Time) — Thu May 01 2008 00:00:00 GMT+0000 (Coordinated Universal Time)
IN SPIC-SMO
Piping Designer
Sat Nov 01 2003 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Dec 01 2006 00:00:00 GMT+0000 (Coordinated Universal Time)
IN GANGES INTERNATIONAL PVT.LTD
Draftsman
Wed May 01 2002 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Jul 01 2003 00:00:00 GMT+0000 (Coordinated Universal Time)
Ganges International Pvt.Ltd
mechanical draftsmen
Wed May 01 2002 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Jul 01 2003 00:00:00 GMT+0000 (Coordinated Universal Time)
IN UCAL FUEL SYSTEMS LTD
Quality Inspector
Sat Sep 01 2001 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Feb 01 2002 00:00:00 GMT+0000 (Coordinated Universal Time)