
Wenjuan Zhang
Wendy Zhang is currently the Supervisor at PG&E Transmission System Planning. She manages annual transmission reliability assessment study... | United States
*50 free lookup(s) per month.
No credit card required.
Wenjuan Zhang’s Emails zh****@pg****.com
Wenjuan Zhang’s Phone Numbers No phone number available.
Social Media
Wenjuan Zhang’s Location United States
Wenjuan Zhang’s Expertise Wendy Zhang is currently the Supervisor at PG&E Transmission System Planning. She manages annual transmission reliability assessment study and develops a portfolio of transmission expansion plans and projects to meet the company's transmission needs for delivery of safe and reliable electric service to our customers while adhering to NERC/WECC/CAISO planning standards. She worked in all three Transmission Planning groups in PG&E including System Planning, Interconnection Planning, and Regional Planning groups. Prior to PG&E, she worked in CAISO for five years on both Transmission Operation and Planning. Generation Interconnection: • Review Interconnection Request from developers • Attend scoping meeting with developer • Develop base case • Run deliverability assessment • Propose mitigation plan for violations • Allocate transmission upgrade cost to cluster of developers • Draft interconnection report • Attend results meeting with developer • Review LGIA(Large Generation Interconnection Agreement) • Process 35 SGIP projects and 30 LGIP (Large Generation Interconnection Project) • Independently conduct interconnection study for Southern PG&E area in Transition Cluster, Cluster2, and Cluster 3. • Involve in methodology and policy making for Generation Interconnection Reform Transmission Planning: • Conduct CAISO 2010/2011 Annual Reliability Assessment for Southern PG&E area • Review and evaluate 2010 request window projects for Southern PG&E area • CAISO 2010 Comprehensive Transmission Planning study to Meet 33% RPS in 2020 • Long term and short term LCR (Local Capacity Requirement) study for Southern PG&E area • CAISO Annual Economic Assessment: performing the production cost simulation for congestion evaluation and mitigation evaluation • Central California Clean Energy Transmission Project (C3ETP): was a planning effort to increase transmission capacity between northern and southern California. • San Francisco 2009 generation reliability assessment Transmission Operation: • Operation Engineer for Bay area and PG&E North west area • Establishing and confirming the operating limits to the Grid • Documenting and updating the associated operating procedures to support the safe and reliable operation of the system • supports the real-time marketing and the transition in the MRTU “Go Live” • Provide 24x7 on-call engineering support for Real-time emergencies Specialties: Generation Interconnection Process, Renewable Integration, Power System Analysis, Electricity Market Simulation, Power System Operation
Wenjuan Zhang’s Current Industry Pacific Gas And Electric
Wenjuan
Zhang’s Prior Industry
Univ Of Tennessee
|
California Independent System Operator
|
Pacific Gas And Electric
Not the Wenjuan Zhang you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

Pacific Gas And Electric
Supervisor, Transmission System Planning
Sat Aug 01 2015 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
Pacific Gas And Electric
Senior Transmission Planning Engineer
Fri Jun 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Jul 01 2015 00:00:00 GMT+0000 (Coordinated Universal Time)
California Independent System Operator
Senior Regional Transmission Engineer
Mon Oct 01 2007 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Jun 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time)
Univ Of Tennessee
Graduate Research Assistant
Fri Aug 01 2003 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Oct 01 2007 00:00:00 GMT+0000 (Coordinated Universal Time)